Biodegradable PLA Pbat Polyethylene Polythene PE HDPE Plastic Extruder Film Blowing Machine Price
Basic Info
Model NO. | SJ-50/HMB600 |
After-sales Service | We Can Supply Service Online |
Warranty | One Year |
Type | PE Film Blowing Machine |
Raw Material | PE |
Maximum Folding Width of Film | 600mm |
Screw Diameter | 50mm |
Automation | Automatic |
Computerized | Non-Computerized |
Machine Weight | 2000kg |
Certification | CE, ISO9001:2008 |
Screw Diameter (mm) | 50 |
Film Width(mm) | 100-600 |
Film Thickness(mm) | 0.006-0.10 |
Max. Extrusion Output (Kg/H) | 60 |
Die Size(mm) | 60/100 High Speed Type |
Main Motor | Siemens Brand |
Inverter | LG Brand |
Temperature Controller | Omron Brand |
Screen Changer | Yes |
Air Ring | Double Vent Air Ring |
Screw Length(L/D) | 30:1 |
Blower | 3kw-4kw |
Cylinder Cooling | 0.13*2/0.13*3 |
Driving Motor | 15kw-30kw |
Total Power | 28kw-50kw |
Transport Package | Wooden Plate |
Specification | 600mm |
Trademark | RuiGao |
Origin | Ruian Zhejiang China |
HS Code | 847730900 |
Production Capacity | 20 Sets/Month |
Product Description
Machine Introduction
Its extruder, cylinder and screw rods are made of quality alloy steel that have been notarized and processed
low density polygene (LDPE), high density polygene(HDPE) and linear low density polygene (LLDPE).
It is widely applied to producing the packing bags for foodstuff, clothing, rubbish bag and vest ones.
Machine Advantages
1, We use stronger steel plate for machine body, which make machine more stable
2, Screw and barrel is nitrigened by 72 hours. 38 chromium materials, it is very hard. Bimetal Materials Taiwan Quality
3, Hard surface gearbox, the life can be more 10 years. GuoMao Brand
4, Motor with CE standard, more 10 years life, Siemens Brand.
5, Electric parts is CHINT, best supplier in China.
6, Easy to operate and one worker can run 3 sets
7, Temperautre Controller: Omron Brand
8, Inverter: LG Brand
9, Ceramic Heater: Heating faster and Keep warm longer
Machine Parameters
Model | SJ-50/HMB600 | SJ-55/HMB800 | SJ-60/HMB1000 | SJ-65/HMB1200 |
Diameter of Screw | Φ50 | Φ55 | Φ60 | Φ65 |
Max. Width of Folded Film(mm) | 200-600 | 300-800 | 400-1000 | 600-1200 |
Single-face Thickness of Film(mm) | 0.006-0.10 | 0.006-0.10 | 0.006-0.10 | 0.006-0.10 |
Max. Extrusion(kg/h) | 60kg/h | 70kg/h | 80kg/h | 90kg/h |
L/D | 30:1 | 30:1 | 30:1 | 30:1 |
Total Power (kw) | 28 | 36 | 40 | 50 |
Driving Power(kw) | 15 | 18.5 | 22 | 30 |
Cylinder cooling Power(kw) | 0.13*2 | 0.13*2 | 0.13*3 | 0.13*3 |
Overall Dimensions(m) | 5.0×2.1×4.0 | 5.0×2.3×4.2 | 5.0×2.3×4.5 | 5.0*2.3*5 |
Weight(kg) | 2500 | 2800 | 3000 | 3200 |
1.Function:reduce the speed of transferring2.Speed Rate:10:13.Gear:Hard surface4.Gear:Hard surface type,high quality5.Lubrication oil for transfering6.Low noise and longer lifeMain Motro:Siemens Brand
1.Running Speed:1400rpm2.Motor Power:380V,3phase,Power can be changed3.Motor Life:more 10yearsHeater:Ceramic heater function
1.heating faster than stainless heater2.life is longer to 5 years3.keeping hot inside is longer than stainless save power4.High quality ceramic and heating wire Inside.
Cover Stainless cover
1.Seperate stainless cover to control heater better and save the power consuption2.Separate blower on stainless cover3.Nice outlook for stainless cover4.High speed blower to cool barrel
Fast screen changer:
1.Save worker working time2.Never leakage for material3.Easily to change the fiter
Die head:Taiwan design high speed
1.#45 steel stronger2.Surface treatment,which make film more transparent3.Bigger size than normal,which improve the output of machinesGusset copied from Taiwan
1.Gusset part is copy from Taiwan,easy to adjust2.Wooden gusset part is makeDouble vent air ring:
1.Two lip to cool the film,it is faster than one lip.So it can improve the output of machine2.It can do HDPE and LDPE filmWe also have other products, if you interest, Please click FILM BLOWING MACHINEPLASTIC BAG MACHINERECYCLING MACHINE PRINTING MACHINE
1,Q: Your factory is trading company or factory?
A: We are factory. We have more 2100 square meter workshop and 23 workers containing the 2 installment engineer and 1 electric engineer. We are Factory, so we have cost advantage than others 2, Q: How do your company control the machine quality?
A: First we control the raw materials quality.Second, we control the quality of machine when we are processing. Third, Our installment engineer will test machine. 3, Q: How about payment term, payment safety and delivery time?
A: We accept 30% deposit, balance before shipment. And Irrevocable L/C at sight. Delivery time is 20 to 30 days. It is according to order quantity. 4,Q: What is your company after sale service?
A: Our installment engineers are available. Normally it will take about 7 to 10 days for all.Our guarantee is one year. If there is any spare parts is broken, we can send them freely to you.
You are welcome to contact with us, we will provide excellent quotation and high quality machine